Gravel Cubic Yard Calculator

Calculate exact cubic yards (yd³), cubic feet (ft³), and cubic meters (m³) of gravel from dimensions in feet, inches, meters, or centimeters. Includes square foot coverage reference charts.

PRO CONTRACTOR & HARDSCAPE TAKEOFF BUNDLE EXCEL (.XLSX) + GOOGLE SHEETS

Need Multi-Layer Takeoffs, Client PDF Proposals & Job Costing in Excel / Google Sheets?

Upgrade to the Pro Excavation, Hardscape & Aggregate Bid Workbook (Excel + Google Sheets)—engineered for contractors, landscapers, and estimators who want instant multi-layer assemblies, dirt spoils hauling math, crew labor markups, and printable client bid sheets.

01. Multi-Layer Driveway & Patio Assembly Takeoff
02. Excavation Spoils & Dump Truck Hauling Optimizer
03. French Drain & Retaining Wall Calculator
04. Crew Loaded Labor & Overhead Markup Calculator
05. Quarry & Supplier Price Book (VLOOKUP)
06. Client-Ready Printable Bid Proposal
07. Material Order & Dispatch Checklist
08. 12-Month Job Costing & Profit Tracker
$24 One-Time Download
Unlocked Formulas
Download Pro Workbook ($24) →
Works in Microsoft Excel, Google Sheets & Apple Numbers

The Mathematics of Cubic Yards

A cubic yard (abbreviated yd³ or cu yd) is the universal volume unit used by landscape supply yards, excavation contractors, and topsoil depots throughout North America.

One linear yard equals 3 feet. Therefore, a 3-dimensional cube measuring one yard in each dimension contains:

Volume Equivalence: 1 Yard = 3 Feet
1 Cubic Yard = 3 ft × 3 ft × 3 ft = 27 Cubic Feet
1 Cubic Yard ≈ 0.76455 Cubic Meters

Quick Coverage Chart: How Much 1 Cubic Yard Covers

Use this handy reference table to quickly estimate how much area one cubic yard covers at common landscape depths:

Installed Depth Sq Ft Covered by 1 Yard Typical Application
1 Inch 324 sq ft Thin top-dressing refresh
2 Inches 162 sq ft Weed-suppressing garden path, walkway
3 Inches 108 sq ft Pea gravel patio, landscape rock beds
4 Inches 81 sq ft Driveways, shed pads, parking stalls
6 Inches 54 sq ft Compacted sub-base course, heavy equipment pads

Frequently Asked Questions About Cubic Yards

One cubic yard contains 27 cubic feet. At 1 inch deep, it covers 324 sq ft; at 2 inches deep, it covers 162 sq ft; at 3 inches deep, it covers 108 sq ft; at 4 inches deep, it covers 81 sq ft; and at 6 inches deep, it covers 54 sq ft.

Multiply length (in feet) by width (in feet) to find total square feet. Multiply square feet by depth in feet (depth in inches divided by 12) to calculate cubic feet. Finally, divide total cubic feet by 27 to obtain cubic yards.

One cubic yard is a cube that measures 3 feet long by 3 feet wide by 3 feet tall (3 ft × 3 ft × 3 ft = 27 cubic feet). It easily fills the entire bed of a standard standard-bed pickup truck up to the top rails.

Spreadsheet & Estimator Reference · Excel & Google Sheets

Excel & Google Sheets Takeoff Formula Cheat Sheet (Gravel Cubic Yard Calculator)

Building your own contractor takeoff sheet in Microsoft Excel or Google Sheets? Copy and paste these exact engineering formulas, or click Download Excel Estimate (.xlsx) above to generate a pre-wired spreadsheet automatically.

Takeoff Metric Cell Reference Setup Excel / Google Sheets Formula Action
Base Volume (Cubic Yards)
Net Geometric yd³
A2 = Length (ft), B2 = Width (ft), C2 = Depth (in) =ROUND((A2*B2*(C2/12))/27, 2)
Order Cubic Yards (+10% Compaction)
Order Volume (yd³)
D2 = Base Cubic Yards, E2 = Waste/Compaction % (0.10) =ROUND(D2*(1+E2), 2)
Order Weight in US Short Tons (General Construction Gravel)
Quarry Scale Tons
F2 = Order Cubic Yards, G2 = Density (1.35 tons/yd³) =ROUND(F2*1.35, 2)
50-Lb (0.5 cu ft) Bags Required
Whole 0.5 cu ft Bags
F2 = Order Cubic Yards (1 yd³ = 27 cu ft = 54 Bags) =ROUNDUP((F2*27)/0.5, 0)
Excavation Loose Dirt Spoils (+25% Swell)
Loose Hauling yd³
A2 = Length (ft), B2 = Width (ft), I2 = Cut Depth (in) =ROUND(((A2*B2*(I2/12))/27)*1.25, 2)
10-Yard Dump Truck Loads (Spoils or Stone)
Truckload Dispatches
J2 = Total Loose Cubic Yards =ROUNDUP(J2/10, 0)
Geotextile Fabric Roll Count (+15% Overlap)
3ft × 100ft Rolls
A2 = Length (ft), B2 = Width (ft), 300 sq ft Roll =ROUNDUP(((A2*B2)*1.15)/300, 0)
Contractor Client Bid Price (Gross Margin %)
Client Quote ($)
K2 = Total Direct Cost ($), L2 = Target Margin (0.30) =ROUND(K2/(1-L2), 2)
Complete Project Workflow · Deterministic Takeoff Suite

Next Step for Your Project

Continue your Cubic Yards takeoff with the next logical companion calculators: