Driveways, Bases & Pads · Contractor Estimation Tool

Crushed Concrete Calculator (Recycled RCA #57 & RC-6 Base)

Calculate recycled crushed concrete aggregate (RCA #57 and RC-6 road base) in tons and cubic yards—accounting for RCA’s lighter 1.28 tons/yd³ density.

PRO CONTRACTOR & HARDSCAPE TAKEOFF BUNDLE EXCEL (.XLSX) + GOOGLE SHEETS

Need Multi-Layer Takeoffs, Client PDF Proposals & Job Costing in Excel / Google Sheets?

Upgrade to the Pro Excavation, Hardscape & Aggregate Bid Workbook (Excel + Google Sheets)—engineered for contractors, landscapers, and estimators who want instant multi-layer assemblies, dirt spoils hauling math, crew labor markups, and printable client bid sheets.

01. Multi-Layer Driveway & Patio Assembly Takeoff
02. Excavation Spoils & Dump Truck Hauling Optimizer
03. French Drain & Retaining Wall Calculator
04. Crew Loaded Labor & Overhead Markup Calculator
05. Quarry & Supplier Price Book (VLOOKUP)
06. Client-Ready Printable Bid Proposal
07. Material Order & Dispatch Checklist
08. 12-Month Job Costing & Profit Tracker
$24 One-Time Download
Unlocked Formulas
Download Pro Workbook ($24) →
Works in Microsoft Excel, Google Sheets & Apple Numbers

How the Crushed Concrete Calculator (Recycled RCA #57 & RC-6 Base) Works

Eco-friendly recycled concrete aggregate (RCA) crushed and magnetically screened into #57 clean or RC-6 dense-graded base that re-calcifies into a hard driveway crust. Our Crushed Concrete Calculator (Recycled RCA #57 & RC-6 Base) computes exact geometric volume in cubic feet and cubic yards, then converts volume into US short tons (2,000 lbs) using the typical bulk density of Recycled Crushed Concrete (RCA #57 / RC-6) (2,550 lb/yd³ or 1.27 tons/yd³).

Mathematical Formula for Crushed Concrete:
1. Area (sq ft) = Length (ft) × Width (ft)
2. Volume (cu ft) = Area (sq ft) × [Depth (inches) ÷ 12]
3. Volume (cu yd) = Volume (cu ft) ÷ 27
4. Recommended Volume = Base Volume × (1 + 15% Ordering Adjustment)
5. Estimated Tons = Recommended Cubic Yards × 1.27 tons/yd³

Step-by-Step Worked Example

Example Project: 60 ft × 12 ft Area at 4 Inches Depth (+15% Adjustment)
  1. Surface Area: 60 ft × 12 ft = 720 sq ft.
  2. Base Volume: 720 sq ft × (4 ÷ 12) = 240.0 cu ft (8.89 cubic yards).
  3. With +15% Ordering Adjustment: 8.89 yd³ × 1.15 = 10.22 cubic yards.
  4. Weight in US Short Tons: 10.22 yd³ × 1.27 tons/yd³ = 13.03 tons (26,067 lbs).

Primary Applications & Contractor Best Practices

  • Economical gravel driveways and farm lanes: Spread over a woven stabilization geotextile in maximum 3–4 inch lifts, moisture-conditioning and compacting each lift with a vibratory plate or roller (+15% compaction allowance recommended).
  • Commercial equipment yards and laydown lots: Account for a +15% ordering adjustment when converting net cubic yards to quarry scale tons (1.27 tons/yd³) to cover subgrade dips and compaction settlement.
  • Soft-soil stabilization and mud mats: Rake and grade in uniform layers using a landscape lute, maintaining positive surface drainage slope (2% minimum grade) away from structures and walkways.
  • Under-slab and parking lot sub-bases: Excavate 12 inches wider than the structure footprint on all four sides, frame with pressure-treated 4×6 or 6×6 timbers, and laser-screed 4 inches of compacted Recycled Crushed Concrete (RCA #57 / RC-6) for a level, rot-free base.

Coverage & Tonnage Quick Reference Table (Recycled Crushed Concrete (RCA #57 / RC-6))

Estimated cubic yards and US short tons (including +15% ordering adjustment) across common project square footages:

Project Area 2" Depth 3" Depth 4" Depth 6" Depth
100 sq ft 0.91 t (0.71 yd³) 1.36 t (1.06 yd³) 1.81 t (1.42 yd³) 2.72 t (2.13 yd³)
250 sq ft 2.26 t (1.77 yd³) 3.39 t (2.66 yd³) 4.53 t (3.55 yd³) 6.79 t (5.32 yd³)
500 sq ft 4.53 t (3.55 yd³) 6.79 t (5.32 yd³) 9.05 t (7.10 yd³) 13.58 t (10.65 yd³)
1,000 sq ft 9.05 t (7.10 yd³) 13.58 t (10.65 yd³) 18.10 t (14.20 yd³) 27.15 t (21.30 yd³)
1,500 sq ft 13.58 t (10.65 yd³) 20.36 t (15.97 yd³) 27.15 t (21.30 yd³) 40.73 t (31.94 yd³)
Spreadsheet & Estimator Reference · Excel & Google Sheets

Excel & Google Sheets Takeoff Formula Cheat Sheet (Crushed Concrete Calculator (Recycled RCA #57 & RC-6 Base))

Building your own contractor takeoff sheet in Microsoft Excel or Google Sheets? Copy and paste these exact engineering formulas, or click Download Excel Estimate (.xlsx) above to generate a pre-wired spreadsheet automatically.

Takeoff Metric Cell Reference Setup Excel / Google Sheets Formula Action
Base Volume (Cubic Yards)
Net Geometric yd³
A2 = Length (ft), B2 = Width (ft), C2 = Depth (in) =ROUND((A2*B2*(C2/12))/27, 2)
Order Cubic Yards (+10% Compaction)
Order Volume (yd³)
D2 = Base Cubic Yards, E2 = Waste/Compaction % (0.10) =ROUND(D2*(1+E2), 2)
Order Weight in US Short Tons (Recycled Crushed Concrete (RCA #57 / RC-6))
Quarry Scale Tons
F2 = Order Cubic Yards, G2 = Density (1.27 tons/yd³) =ROUND(F2*1.27, 2)
50-Lb (0.5 cu ft) Bags Required
Whole 0.5 cu ft Bags
F2 = Order Cubic Yards (1 yd³ = 27 cu ft = 54 Bags) =ROUNDUP((F2*27)/0.5, 0)
Excavation Loose Dirt Spoils (+25% Swell)
Loose Hauling yd³
A2 = Length (ft), B2 = Width (ft), I2 = Cut Depth (in) =ROUND(((A2*B2*(I2/12))/27)*1.25, 2)
10-Yard Dump Truck Loads (Spoils or Stone)
Truckload Dispatches
J2 = Total Loose Cubic Yards =ROUNDUP(J2/10, 0)
Geotextile Fabric Roll Count (+15% Overlap)
3ft × 100ft Rolls
A2 = Length (ft), B2 = Width (ft), 300 sq ft Roll =ROUNDUP(((A2*B2)*1.15)/300, 0)
Contractor Client Bid Price (Gross Margin %)
Client Quote ($)
K2 = Total Direct Cost ($), L2 = Target Margin (0.30) =ROUND(K2/(1-L2), 2)

Frequently Asked Questions

Multiply your project length (60 ft) by width (12 ft) to get area (720 sq ft). Multiply by depth in feet (4 in ÷ 12 = 0.33 ft) to get 240.0 cubic feet, then divide by 27 to get 8.89 base cubic yards. Adding a 15% ordering adjustment gives 10.22 yd³, which equals 13.03 US short tons at 2550 lb/yd³.

One cubic yard (27 cubic feet) of Recycled Crushed Concrete (RCA #57 / RC-6) weighs approximately 2,550 pounds, or 1.27 US short tons (94 lbs per cubic foot). Typical regional quarry densities range between 2,400 and 2,750 lb/yd³.

For most crushed concrete installations, a typical compacted depth is 6 inches (our default preset uses 4 inches). Always excavate soft organic topsoil and install woven or non-woven geotextile fabric before spreading aggregate.

At 1.27 tons per cubic yard, 1 US short ton equals 0.78 cubic yards (21.2 cu ft). That covers approximately 127 sq ft at 2" deep, 85 sq ft at 3" deep, and 64 sq ft at 4" deep.

Complete Project Workflow · Deterministic Takeoff Suite

Next Step for Your Project

Continue your Crushed Concrete takeoff with the next logical companion calculators: